In response to the limited space within subway tunnels, Changyun Technology has developed the "Transmitter 600 Wilderness Edition" Cable conveyor. This equipment features a single-track design (with dimensions of 74×46.5×55.5cm) and is capable of accommodating cables ranging from 1 to 10cm in diameter. Notably, during the construction of the section tunnels for Guangzhou Metro Line 18, it successfully completed the laying of control cables with a total length of 5.8 kilometers. Its remote control function (with a maximum control distance of 100 meters) and 4-speed adjustment (0-22 meters per minute) enable operators to perform precise operations in complex conditions from safe areas, significantly reducing construction risks within the tunnels.
RELATED
RELATED
RELATED
RELATED
Этот веб-сайт использует файлы cookie, чтобы обеспечить вам максимально эффективное использование нашего веб-сайта.
Комментарий
(0)